On behalf of Porirua City Council we are renewing the drinking watermain along Mana Avenue in Titahi Bay, from Dimock Street to Jillett Street. Renewing this aging pipe will increase the resilience of the drinking water network in Titahi Bay.

Start Date
8/08/2023
End Date
29/02/2024
Contact:

If you have any questions about this work, please contact:

Wellington Water, 04 912 4400

Latest Updates

30 September 2023

Work is progressing well - check out our photos.

Work starts 8 August and continues through to February 2024. Hours of work will generally be between 7am and 6pm Monday to Friday with work on Saturday if required.

 There will be some temporary restrictions to on-street car parking. Contractors will do their best to keep residents advised of which section of road will be affected by the following day’s work, and where to avoid parking.

 Your assistance in avoiding parking in the intended work zone will help us to get the work done as quickly as possible.

In 2022 a project assessing the state of the network, the Three Waters Renewals Project, identified a number of pipes that have reached the end of their design life or have been given a low condition grade.

 The renewal of these pipes is being fast-tracked.

 This is part of our ongoing work to improve the delivery of safe drinking water to homes and businesses,  and to reduce the risk of emergency repairs and/or outages and minimise risks to public health and the environment.

 

All Updates

30 September 2023

Mana Ave watermain works