WASTEWATER LEAK - PROSSER STREET, TITAHI BAY
Wellington Water crews responding to a wastewater leak on Prosser Street, Titahi Bay

Our team have responded to a wastewater leak at the corner of Prosser Street and Titahi Bay Road. 

Excavation is currently underway. The pump station is operating but will need to be shutdown before repair. Plans to divert the wastewater flow away from the pipe is being developed as the pipe will also need to be shutdown before repair.

There has been an earlier discharge into the stormwater network. This has now stopped with sucker trucks managing the flow, preventing wastewater entering the stormwater network. Signage has been placed at the outlets into the harbour and water quality sampling will be underway.

Traffic management has been set up on Titahi Bay Road. One southbound lane has been closed.

Water Networks / Murphy Street Overflow

Murphy Street Overflow

Overview
Background

On behalf of Wellington City Council we are investigating ways to reduce surface flooding on Murphy Street.

Contact:

If you have any questions about this work, please contact:

Wellington Water, 04 912 4400

On behalf of Wellington City Council, Wellington Water is looking at ways to address surface flooding caused by heavy rainfall events impacting local homes, schools and businesses at low-lying points of Murphy Street in Thorndon.