WASTEWATER LEAK - PROSSER STREET, TITAHI BAY
Wellington Water crews responding to a wastewater leak on Prosser Street, Titahi Bay

Our team have responded to a wastewater leak at the corner of Prosser Street and Titahi Bay Road. 

Excavation is currently underway. The pump station is operating but will need to be shutdown before repair. Plans to divert the wastewater flow away from the pipe is being developed as the pipe will also need to be shutdown before repair.

There has been an earlier discharge into the stormwater network. This has now stopped with sucker trucks managing the flow, preventing wastewater entering the stormwater network. Signage has been placed at the outlets into the harbour and water quality sampling will be underway.

Traffic management has been set up on Titahi Bay Road. One southbound lane has been closed.

In this section
Contractors / Technical Information / Water Network Plans

Water Network Plans

The Water Network Plans for the Wellington region help provide an understanding of the water network.

These plans map out where all the drinking water assets are, including the drinking water pipes, fire hydrants, pump stations, reservoirs and valves. These plans also show information about the diameter, material, and year installed for the drinking water pipes. 

 

Wairarapa Water Network Plans 

 

Porirua Water Network Plans 

 

Hutt Valley Water Network Plans 


Wellington Water Network Plans