WASTEWATER LEAK - PROSSER STREET, TITAHI BAY
Wellington Water crews responding to a wastewater leak on Prosser Street, Titahi Bay

Our team have responded to a wastewater leak at the corner of Prosser Street and Titahi Bay Road. 

Excavation is currently underway. The pump station is operating but will need to be shutdown before repair. Plans to divert the wastewater flow away from the pipe is being developed as the pipe will also need to be shutdown before repair.

There has been an earlier discharge into the stormwater network. This has now stopped with sucker trucks managing the flow, preventing wastewater entering the stormwater network. Signage has been placed at the outlets into the harbour and water quality sampling will be underway.

Traffic management has been set up on Titahi Bay Road. One southbound lane has been closed.

In this section
Contractors / Health & Safety / Health And Safety At Wellington Water

Health and Safety at Wellington Water

What we’re focused on managing and improving

People first, every time.

That’s our vision for everyone working in the Wellington Water family – from employees through to contractors and suppliers.

Our effort is focused on ensuring everyone can come to work and return home safely. We are big on having a healthy culture and ensuring the work we do is done in a way that supports positive health and safety outcomes.

We work with employees and our partners to tackle our critical risks head-on. We value and actively look after the wellbeing our workforce, measuring our performance and investing in our capability.

Welcome to the family, and we look forward to working with you.