WASTEWATER LEAK - PROSSER STREET, TITAHI BAY
Wellington Water crews responding to a wastewater leak on Prosser Street, Titahi Bay

Our team have responded to a wastewater leak at the corner of Prosser Street and Titahi Bay Road. 

Excavation is currently underway. The pump station is operating but will need to be shutdown before repair. Plans to divert the wastewater flow away from the pipe is being developed as the pipe will also need to be shutdown before repair.

There has been an earlier discharge into the stormwater network. This has now stopped with sucker trucks managing the flow, preventing wastewater entering the stormwater network. Signage has been placed at the outlets into the harbour and water quality sampling will be underway.

Traffic management has been set up on Titahi Bay Road. One southbound lane has been closed.

In this section
About Us / Contact / Email Notification Service

Email notification service

At Wellington Water we want to make it as easy as possible for you to find out what is happening with your water and the network. 

You can subscribe to the following:

  • Outage notice - for updates on water outages
  • Discharge notice - for updates on Wastewater Treatment Plant discharges
  • Fluoride monitoring - for updates on fluoride services at Water Treatment Plants


Your information will only be used to send the selected notifications. You will be able to unsubscribe or change your selections at any time through the preferences link in all emails. 

Network Status

See the Network Status for current water updates

Report an issue

Please contact your local council for an issues regarding your drinking water, stormwater or wastewater