WASTEWATER LEAK - PROSSER STREET, TITAHI BAY
Wellington Water crews responding to a wastewater leak on Prosser Street, Titahi Bay

Our team have responded to a wastewater leak at the corner of Prosser Street and Titahi Bay Road. 

Excavation is currently underway. The pump station is operating but will need to be shutdown before repair. Plans to divert the wastewater flow away from the pipe is being developed as the pipe will also need to be shutdown before repair.

There has been an earlier discharge into the stormwater network. This has now stopped with sucker trucks managing the flow, preventing wastewater entering the stormwater network. Signage has been placed at the outlets into the harbour and water quality sampling will be underway.

Traffic management has been set up on Titahi Bay Road. One southbound lane has been closed.

In this section
Help & Advice / Land Development / Adjusting, Upgrading Or Extending

Adjusting, upgrading or extending

It may be necessary to adjust, upgrade or extend the existing drinking water, wastewater or stormwater networks when building or subdividing.

An adjustment may be as small as raising or lowering an existing manhole to suit new ground levels or as large as relocating a section of the network in a new position. An extension may be as small as adding a short section onto the existing end of a pipe or as large as planning new drinking water, wastewater or stormwater systems (to be vested to Council) to service a multi lot subdivision.

Regional Standard for Water Services

The Regional Standard for Water Services, details the objectives, performance criteria and design requirements when undertaking any works on the existing public three waters networks or creating new public three waters networks. Individual Council Codes of Practice also provide some additional guidance.

Regional Specification for Water Services

The Regional Specification for Water Services, lists the technical requirements for materials and methods used in construction of three waters infrastructure.

Safety in Design

Safety in Design hazard identification and assessments are to be integrated into the design. The design must integrate how to eliminate, or if this is not reasonably practicable, minimise the risks to health and safety throughout the life of the structure. 

Making changes to the public network - Contacts

Engineering approval is required for all adjustments, upgrades or extensions to the three waters networks. 

Application for engineering approval for works as part of a subdivision or land use consent:

 

 

All proposals to adjust, upgrade or extend the three waters networks, outside of the subdivision process, must be submitted to land.development@wellingtonwater.co.nz review and approval.