WASTEWATER LEAK - PROSSER STREET, TITAHI BAY
Wellington Water crews responding to a wastewater leak on Prosser Street, Titahi Bay

Our team have responded to a wastewater leak at the corner of Prosser Street and Titahi Bay Road. 

Excavation is currently underway. The pump station is operating but will need to be shutdown before repair. Plans to divert the wastewater flow away from the pipe is being developed as the pipe will also need to be shutdown before repair.

There has been an earlier discharge into the stormwater network. This has now stopped with sucker trucks managing the flow, preventing wastewater entering the stormwater network. Signage has been placed at the outlets into the harbour and water quality sampling will be underway.

Traffic management has been set up on Titahi Bay Road. One southbound lane has been closed.

In this section
About Us / News And Media / News And Media / Minor Sewer Discharge From Eastbourne Sewer

Published 23/12/2019

Minor sewer discharge from Eastbourne Sewer

Update 24 December 4.45pm

The Eastbourne leak has been contained and repairs are underway. Warning signs will remain in place for 2 days.
---
Due to a leak in a wastewater pipe, there is an intermittent discharge of wastewater into the harbour at Sunshine Bay, Eastbourne.

Warning signs are in place, please don’t swim in the area.

We’re working to find and repair the leak as quickly as we can.
At this stage we are unable to confirm the volume of the discharge. The affected pipe serves about 70 households in the area.

You can check the water quality in your favourite swimming spots on the LAWA map: https://www.lawa.org.nz/explore-data/swimming/

Media Enquiries

Email address:  Media@wellingtonwater.co.nz

Phone number: 021 302 259