WASTEWATER LEAK - PROSSER STREET, TITAHI BAY
Wellington Water crews responding to a wastewater leak on Prosser Street, Titahi Bay

Our team have responded to a wastewater leak at the corner of Prosser Street and Titahi Bay Road. 

Excavation is currently underway. The pump station is operating but will need to be shutdown before repair. Plans to divert the wastewater flow away from the pipe is being developed as the pipe will also need to be shutdown before repair.

There has been an earlier discharge into the stormwater network. This has now stopped with sucker trucks managing the flow, preventing wastewater entering the stormwater network. Signage has been placed at the outlets into the harbour and water quality sampling will be underway.

Traffic management has been set up on Titahi Bay Road. One southbound lane has been closed.

In this section
About Us / News And Media / News And Media / Porirua Flooding Drop-in Sessions

Published 9/07/2018

Porirua flooding drop-in sessions

Porirua City Council and Wellington Water are holding some drop-in evenings to discuss the latest flooding hazards that we have been modelling and mapping in Titahi Bay, Porirua CBD, Plimmerton and Cannons Creek.

We are interested in the community’s observations, any photos of local flooding recently experienced and any information that could help us understand the catchment areas better. If you have been affected by flooding it would be great to see you at one of our sessions.

The drop in sessions will be held on:

  • Thursday 12 July from 7pm to 8.30 pm at Titahi Bay Primary school.
  • Tuesday 24 July from 7pm to 8.30pm at Porirua School.
  • Tuesday 31 July from 7pm to 8.30pm at St Theresas Catholic Church.
  • Wednesday 8 August from 7pm to 8.30pm at Cannons Creek School.

See you there.

Media Enquiries

Email address:  Media@wellingtonwater.co.nz

Phone number: 021 302 259