WASTEWATER LEAK - PROSSER STREET, TITAHI BAY
Wellington Water crews responding to a wastewater leak on Prosser Street, Titahi Bay

Our team have responded to a wastewater leak at the corner of Prosser Street and Titahi Bay Road. 

Excavation is currently underway. The pump station is operating but will need to be shutdown before repair. Plans to divert the wastewater flow away from the pipe is being developed as the pipe will also need to be shutdown before repair.

There has been an earlier discharge into the stormwater network. This has now stopped with sucker trucks managing the flow, preventing wastewater entering the stormwater network. Signage has been placed at the outlets into the harbour and water quality sampling will be underway.

Traffic management has been set up on Titahi Bay Road. One southbound lane has been closed.

In this section
About Us / News And Media / News And Media / Wellington Water Chair Steps Down

Published 16/05/2023

Wellington Water Chair steps down

Wellington Water’s Board Chair Lynda Carroll has stepped down from the Board.

“I’d like to thank Lynda for her significant contribution to the organisation,” says Wellington Water Committee Chair Campbell Barry.

“Lynda joined the Board in June 2021 and took over the Chair role in November 2021. During that time, she has overseen the organisation through some challenging times and her commitment to supporting the company and the important work that the people at Wellington Water do has been apparent,” says Campbell Barry.

“As Wellington Water moves closer towards water reforms and essentially, its transition to a new organisation, the work of the company will become increasingly more operational,” says Lynda. “As a strategist and forward looking leader, it now feels like the right time for me to step back and allow someone else to step in to support the organisation through the next stages.

“I’d like to thank the Board for their support during my time as Chair as well as the CE, SLT and wider team at Wellington Water.”

The Wellington Water Board will meet later today to appoint an interim Chair.

A separate appointment process is underway to fill the currently vacant Director roles, which will be announced once completed.

ENDS

Media Enquiries

Email address:  Media@wellingtonwater.co.nz

Phone number: 021 302 259