Water Networks / Projects / Projects / Pressure Control Valves (prv) Upgrades

Pressure Control Valves (PRV) Upgrades

We are replacing Pressure Control Valves (PRV's) that help manage water pressure across the drinking water network. These valves typically have a service life of round 25 - 30 years. Replacing them now ensures continued protection of both the drinking water network and your private pipes from too much pressure.
Overview
Current status
All Updates
Start Date
1/07/2026
End Date
30/06/2027
Contact:

If you have any questions about this work, please contact:

Tiaki Wai,  0800 TIAKI WAI (0800 842 549)

Latest Updates

24/08/26 Amesbury Drive works underway

This renewal work will help ensure ongoing protection of the public drinking water network and household pipes from excessive water pressure .

05/08/26 Baroda Street works underway

This renewal work will help ensure ongoing protection of the public drinking water network and household pipes from excessive water pressure .

05/08/26 Pukerua Beach Road works underway

This renewal work will help ensure ongoing protection of the public drinking water network and household pipes from excessive water pressure .

Summary

We are replacing Pressure Control Valves (PRV's) that help manage water pressure across the drinking water network. These valves typically have a service life of round 25 - 30 years. Replacing them now ensures continued protection of both the drinking water network and your private pipes from too much pressure.

This work involves excavation and the use of heavy machinery. Noise may be more noticeable when construction is close to your property.

Short water outages may be required during works. We'll let you know before there are any interruptions to your supply.

There will be temporary traffic management in place where necessary, including parking restrictions, pedestrian detours, and reduced speed limits. 

Timeline

  • Portion 1 (Years 1 and 2) to be completed by 30 June 2027
  • Portion 2 (Year 3) scope to be confirmed, to be completed by 30 June 2028

Locations

Upper Hutt
47 Whitemans Road, Silverstream Due to start in September 2026
48 Kirton Drive, Riverstone Terraces Under Construction
22 McCarthy Grove, Clouston Park Under Construction
Lower Hutt
1 Belmont Terrace, Belmont 
41, London Road Due to start in September
50, Sunshine Crescent, Kelston 
Avonlea Grove / Wairere Road intersection, Belmont
502 Stokes Valley Road, Stokes Valley
Wellington city
49 Amesbury Drive, Churton Park Under Construction

467 Baroda Street - Khandallah

Under Construction 

26 Dungarvan Road - Newlands

Under Construction 

Glover Street / SH1 Intersection - Ngauranga

4 Landfill Road, Brooklyn Starting soon
Porirua City
Pukerua Beach Road, Pukerua Bay Under Construction



All Updates

24/08/26 Amesbury Drive works underway

What to expect

  • Working hours - Crews will typically be onsite between 7 am to 5:30 pm from Monday to Friday. If required, they may work on Saturdays from 8 am to 2 pm. 
  • Construction noise - This work will involve excavation, pipe installation, and the use of heavy machinery. Noise may be more noticeable when construction is close to your property. 
  • Keeping our community safe - Temporary traffic management may be in place, including parking restrictions, pedestrian detours, and reduced speed limits.
  • Signage and crew members will help guide vehicles and pedestrians safely around the work area.  
  • Impacts to water supply Short water outages may be required when connecting the new pipe. We'll let you know before there are any interruptions to your supply.  

    We appreciate your understanding and patience as we undertake this essential work. 
     
05/08/26 Baroda Street works underway

What to expect

  • Working hours - Crews will typically be onsite between 7 am to 5:30 pm from Monday to Friday. If required, they may work on Saturdays from 8 am to 2 pm. 
  • Construction noise - This work will involve excavation, pipe installation, and the use of heavy machinery. Noise may be more noticeable when construction is close to your property. 
  • Keeping our community safe - Temporary traffic management may be in place, including parking restrictions, pedestrian detours, and reduced speed limits.
  • Signage and crew members will help guide vehicles and pedestrians safely around the work area.  
  • Impacts to water supply Short water outages may be required when connecting the new pipe. We'll let you know before there are any interruptions to your supply.  

    We appreciate your understanding and patience as we undertake this essential work. 
     
05/08/26 Pukerua Beach Road works underway

What to expect

  • Working hours - Crews will typically be onsite between 7 am to 5:30 pm from Monday to Friday. If required, they may work on Saturdays from 8 am to 2 pm. 
  • Construction noise - This work will involve excavation, pipe installation, and the use of heavy machinery. Noise may be more noticeable when construction is close to your property. 
  • Keeping our community safe - Temporary traffic management may be in place, including parking restrictions, pedestrian detours, and reduced speed limits.
  • Signage and crew members will help guide vehicles and pedestrians safely around the work area.  
  • Impacts to water supply Short water outages may be required when connecting the new pipe. We'll let you know before there are any interruptions to your supply.  

    We appreciate your understanding and patience as we undertake this essential work. 
     













05/08/26 Dungarvan Street works underway

What to expect

  • Working hours - Crews will typically be onsite between 7 am to 5:30 pm from Monday to Friday. If required, they may work on Saturdays from 8 am to 2 pm. 
  • Construction noise - This work will involve excavation, pipe installation, and the use of heavy machinery. Noise may be more noticeable when construction is close to your property. 
  • Keeping our community safe - Temporary traffic management may be in place, including parking restrictions, pedestrian detours, and reduced speed limits.
  • Signage and crew members will help guide vehicles and pedestrians safely around the work area.  
  • Impacts to water supply Short water outages may be required when connecting the new pipe. We'll let you know before there are any interruptions to your supply.  

    We appreciate your understanding and patience as we undertake this essential work. 
     

05/08/26 Amesbury Drive works underway

What to expect

  • Working hours - Crews will typically be onsite between 7 am to 5:30 pm from Monday to Friday. If required, they may work on Saturdays from 8 am to 2 pm.
  • Construction noise - This work will involve excavation, pipe installation, and the use of heavy machinery. Noise may be more noticeable when construction is close to your property.
  • Keeping our community safe - Temporary traffic management may be in place, including parking restrictions, pedestrian detours, and reduced speed limits. Signage and crew members will help guide vehicles and pedestrians safely around the work area.
  • Impacts to water supply - Short water outages may be required when connecting the new pipe. We'll let you know before there are any interruptions to your supply. 

We appreciate your understanding and patience as we undertake this essential work.  