WASTEWATER LEAK - PROSSER STREET, TITAHI BAY
Wellington Water crews responding to a wastewater leak on Prosser Street, Titahi Bay

Our team have responded to a wastewater leak at the corner of Prosser Street and Titahi Bay Road. 

Excavation is currently underway. The pump station is operating but will need to be shutdown before repair. Plans to divert the wastewater flow away from the pipe is being developed as the pipe will also need to be shutdown before repair.

There has been an earlier discharge into the stormwater network. This has now stopped with sucker trucks managing the flow, preventing wastewater entering the stormwater network. Signage has been placed at the outlets into the harbour and water quality sampling will be underway.

Traffic management has been set up on Titahi Bay Road. One southbound lane has been closed.

Water Networks / Western Wastewater Treatment Plant Outfall Pipe Renewal

Western wastewater treatment plant outfall pipe renewal

Overview
Current status
Background

On behalf of Wellington City Council, we are upgrading and realigning the outfall pipe at the treatment plant after it was damaged in a slip. This work will improve the resilience of the pipe .

Start Date
13/03/2023
Contact:

If you have any questions about this work, please contact:

Wellington Water, 04 912 4400

The pipe renewal is now complete.

The outfall pipe at the Western wastewater treatment plant carries fully treated effluent out to Cook Strait.

In February 2022, it was damaged by a slip during a severe wet weather event. The pipe was was repaired, but was damaged again by a further slip during a subsequent wet weather event.

To address this and ensure the resilience of the pipe, work is now underway to stabilise the surrounding area and realign the pipe, including building a pipe bridge to further protect it from the risk of slips and damage from severe weather events.

Until this work is completed fully treated effluent is being discharged into Karori Stream, which is being continually monitored.